Lisa & Adam Goldberg Deer Hill Blog #11 cont

Well here is part 2.  I found a new and easier way to add pictures so they might be a little bigger.  As you know I like to go overboard on the pictures so here it goes.

1/13/10 - Permanent electric has arrived.  They are feeding the cable  to our meter..  Now we can pay them even more money!!!1/13/10 - Permanent electric has arrived. 1/13/10 - They are venting our roof.  Basically they are building an  additional roof on top of our existing roof.  As usual Luis #2 is hard at  work.  The lull is a very useful machine.1/13/10 - They are venting our roof. 1/13/10 - That rope was running though the conduit under ground when it was  installed.  They are using it to pull the electric cable from the pole at  the St. to the transformer.1/13/10 - That rope was running though the conduit 1/13/10 - There goes the cable.
1/13/10 - Here comes the cable. This is exciting. 1/13/10 - They pulled a line man to? The transformer sits on this. 1/13/10 - Our electric cables. 1/13/10 - Collin sharpening a drill bit.
1/13/10 - Luis #1 daring me to come up on the roof. Like I have not been there before. 1/13/10 - A good picture of them putting strapping on the roof and the lull in action. 1/13/10 - Our transformer before it is wired. 1/13/10 - Here come the wires
1/13/10 - Stripping the wire.  I was wondering how they did  that.  Today was like an episode of 1/13/10 - Stripping the wire. 1/13/10 - No this was not staged.  It really takes 4 lines man to wire  a transformer.  When they 1st got to the site they were all smoking  cigars.  They must have a great union.It really takes 4 lines man to wire a transformer. 1/13/10 - The top ridge of our garage roof. 1/13/10 - Luis running a chalk line for the roof sheathing.  When I  got up to the roof I snuck up behind him and scared him.1/13/10 - Luis running a chalk line for the roof sheathing.
1/13/10 - Peter & Bettylou's house from our Rooftop.  It features  the Bowlesberg pool club as Colin will say.1/13/10 - Peter & Bettylou's house from our Rooftop. 1/13/10 - They are standing on the lull working on the roof. 1/13/10 - Its housecleaning time. The port-a-let guy is here to have some fun. 1/13/10 - Another view of them working on the roof
1/13/10 - The beginnings of our deck. 1/13/10 - Housecleaning with a smile. Need I say more! 1/13/10 - Connecting our cable to the wires. 1/13/10 - They are working hard.
1/13/10 - We are live. How cool is that? 1/13/10 - Collin working on our deck. Its going up quick. 1/13/10 - This is the roof venting.  It creates a 1 3/41/13/10 - This is the roof venting. 1/13/10 - The ridge of the house now vented
1/13/10 - Our garage roof. 1/13/10 - Our fully functional transformer. 1/13/10 - Our electric meter at 0.  How long can we keep it  there?  Maybe we will just continue to use the line we are running from  Peter & Bettylou's.1/13/10 - Our electric meter at 0. 1/13/10 - Collin is moving quick on the deck.
1/13/10 - Our shingles have arrived. Desert Tan. 1/13/10 - Our 1/13/10 - Our "home slicker" has arrived. 1/14/10 - Shingles are being installed.  I have to say I really like  being on the roof.  This might turn into my 1/14/10 - Shingles are being installed. 1/14/10 - The Luis's putting on backing for the fascia.  I have no  idea how Luis #2 is staying on that roof.  He is holding the wood in 1  hand, the staple gun in the other and has 1 foot on the 1/14/10 - The Luis's putting on backing for the fascia.
1/14/10 - Here is another view. Unbelievable. 1/14/10 - Once again Luis doing some acrobatics. 1/14/10 - They just installed the skylights. 1/14/10 - Rolling out roofing paper
1/14/10 - Looking out our sky light. What a view minus Luis.  Just  kidding Luis.1/14/10 - Looking out our sky light. 1/14/10 - Just can't get me off the roof. 1/14/10 - Our skylights.  These are over our shower and spa tub in the  master bath.1/14/10 - Our skylights. 1/14/10 - I was going for an artistic thing.

Once again, Happy New Year and thanks for your interest and emails.
Lisa, Adam, Oz & Raz
 

Add comment


Security code
Refresh

Contact Us!

  1. Your Name(*)
    Please let us know your name.
  2. Your Email(*)
    Please let us know your email address.
  3. Subject(*)
    Please write a subject for your message.
  4. Message(*)
    Please let us know your message.
  5. Please type the 4 letters
    Please type the 4 letters
      RefreshInvalid Input
Brooks Post & Beam Inc.
208 Pettingill Hill Road, Lyndeborough, New Hampshire 03082
Tel (603) 654-3210
Copyright ©2008 Brooks Post & Beam Inc.- All Rights Reserved.
Home | Search MLS | Bookmark this page | Paul Freeman