Lisa & Adam Goldberg Deer Hill Blog #12

Written by Lisa & Adam Goldberg   

 

Hello:

This blog is dedicated to Erin for her persistence in wanting to see the progress in the house and for the cookbook. Thank you for your enthusiasm!!! Also Happy Birthday Bettylou!!!

Well, we just got back from a house visit. Its cold but the french doors are in. I need to take a step back. Since we last blogged our roof is finished, all of the skylights are in, the windows and doors are in and they have begun to side the house. Also, they framed the closet/laundry room ad built the platforms for the upstairs shower and tub. They have also been working hard on the window trim. We have had the electrician in to put in some switches that had to go in before the doors could be installed and the plumber has come by twice to survey the situation and look and plumbing fixtures. He will start next week. The final stair quotes are in and the stairs to the basement should get installed next week. So here come the pictures. Oh yeah, I almost forgot, The guys from Brooks came back and installed our deck. Sorry Paul its getting late and I've had a rough week and its only Wednesday.

1/15/10 - West side of house shingled 1/15/10 - Luis laying shingles 1/15/10 - Colin & Luis rolling out felt paper around the 2 sky lights that are in the master bathroom. 1/15/10 - North side of the garage all shingled.
1/16/10 - Checking out the scene. What happened to my shingles? 1/17/10 - CC watching the progress on Lisa  and myself cleaning up around  the lot.  CC is a stray cat that adopted 11 South St.1/17/10 - CC watching the progress 1/18/10 - Those 2x10 are real heavy.  Luis  makes it look easy.   They are putting the trim on the side of the dormer.1/18/10 - Those 2x10 are real heavy. 1/18/10 - Finishing the trim on the steep roof.
1/18/10 - Raspberry was jealous cause Oz  was always in the blog.  Here  you go Raz.1/18/10 - Raspberry was jealous cause Oz was always in the blog. 1/18/10 - They finished venting the roof and are now putting the felt paper on. 1/18/10 - I cam back from work a few hours later and vallah. The shingles are on. 1/19/10 - The beginnings of our shower wall.
1/19/10 - We have stairs. These are temps but still we do not have to climb a ladder to get to the 2nd flr. Wow. 1/20/10 - Luis installing the 2 sky lights in our closet/laundry room 1/20/10 - 1st view from inside. 1/20/10 - Looking out of the hole for the  windows in the breakfast  nook.  They just trimmed the rough opening down to size.1/20/10 - Looking out of the hole for the windows in the breakfast nook.
1/20/10 - The opposite view. Looking in. 1/20/10 - Our windows and doors have arrived. 1/21/10 - 1st window to go in. This is real exciting. This window is above the garage doors. 1/21/10 - The breakfast nook windows. How quickly the look of the house changes.
1/21/10 - The breakfast nook from the inside out. 1/21/10 - The north side and our 70's style windows. 1/21/10 - The interior view of the waterfall windows. 1/21/10 - The waterfalls from the outside. They did all of the windows in 1 day. All in all we have 32 windows.
1/22/10 - In goes the 1st french door. 1/22/10 - Looking good from the outside.   But wait.  The  electrician did not come and run the wires that are need for the  switches next  to the door.  Out comes the door until the electrician comes.  Oh  well.1/22/10 - Looking good from the outside 1/22/10 - Basement sliders. 1/22/10 - CC looking to get put to work. This cat follows us around like a dog.
1/24/10- I am working hard cleaning up the lot 1/24/10 - A nice view of the breakfast nook  and our pile of trash.   FYI this is a very green project.  If you have noticed there is not been  a  dumpster in any pictures,  That is because we do not have one.  Every  weekend Lisa and I go around the lot and clean up all of the debris and  trash  and sort it.  We burn what we can in our wood stove and recycle the  rest.  If it went into a dumpster we could not do that.  It takes us  about 8 hours every weekend to do this.  I then take it to the dump  during  the week.1/24/10 - A nice view of the breakfast nook and our pile of trash 1/24/10 - Another view of the house. This shows how the deck will wrap around the house. 1/24/10 - A view from our favorite rock.
1/24/10 - A good view of the breakfast nook 1/24/10 - The framing to our master bath. 1/26/10 - The Brooks guys are back to build  our porch.  They are  loading the frame onto the lull so Ray can move it to the back of the  house for  them.1/26/10 - The Brooks guys are back to build our porch 1/26/10 - Here is the lull in action. This thing does it all.
1/26/10 - Here is Ray Smith and Andrew from  Brooks working together to make  sure the roof over the deck will work.  Don't you love it when subs get  along. :)1/26/10 - Here is Ray Smith and Andrew from Brooks 1/26/10 - Luis putting the trim up on the garage. All of the exterior trim will get painted to match the windows. 1/26/10 - The homeslicker is up as well as the 1st 2 post. That's Mark by the way. 1/26/10 - Our post and beam porch.  This  part of the porch is going to  have a roof with 2 ceiling fans and recessed lights.1/26/10 - Our post and beam porch
1/26/10 - Andrew and Mark are drilling holes and knocking in pegs respectively. 1/26/10 - Here is a close up. 1/27/10 - The siding begins.  We are using  cedar clapboards  pre-stained redwood.  There is felt paper and homeslicker underneath the   siding.1/27/10 - The siding begins. 1/27/10 - The electricians are here to wire those switches by the french doors.
1/27/10 - Here is Rob fighting with some wires. 1/27/10 - And here are the plumbers.  They  were not happy about being  in front of the camera.  I explained to them that it is a requirement  for  this job.  They will get used to it.1/27/10 - And here are the plumbers. 1/27/10 - Cutting up our SIP panel to make a wire chase. We pay to build it so they can destroy it. 1/27/10 - Here is another shot with Oz supervising
1/27/10 - The siding continues 1/28/10 - As the siding turns. 1/28/10 - Colin is building the floor to  our shower. He did it in  quadrants to accommodate the plumbing that needs to be run underneath.1/28/10 - Colin is building the floor to our shower 1/28/10 - The platform for the tub.
1/28/10 - Luis building the wall in our closet laundry room. It separates the closet/laundry from our storage area. 1/28/10 - Another view. 2/3/10 - The base to the shower in the 1st flr bathroom. 2/3/10 - The siding is almost finished on this side
2/3/10 - Garage is done 2/3/10 - Front of garage begins. 2/3/10 - Looking good 2/3/10 - All done. How quick was that!!!
2/3/10 - French doors are back in.for good this time!!! 2/3/10 - Jetta tub for master bath. 2/3/10 - The doors from our upstairs deck. 2/3/10 - The french doors in our great room. All of the french doors are installed.

Well that's all. 
Thanks for putting up with my ramblings.  Till next time.
Lisa, Adam, Oz & Raz
 

Add comment


Security code
Refresh

Contact Us!

  1. Your Name(*)
    Please let us know your name.
  2. Your Email(*)
    Please let us know your email address.
  3. Subject(*)
    Please write a subject for your message.
  4. Message(*)
    Please let us know your message.
  5. Please type the 4 letters
    Please type the 4 letters
      RefreshInvalid Input
Brooks Post & Beam Inc.
208 Pettingill Hill Road, Lyndeborough, New Hampshire 03082
Tel (603) 654-3210
Copyright ©2008 Brooks Post & Beam Inc.- All Rights Reserved.
Home | Search MLS | Bookmark this page | Paul Freeman