Lisa & Adam Goldberg Deer Hill Blog #13

Written by Lisa & Adam Goldberg   

Lisa and I just got to enjoy our 1st full moon at the house.  How awesome!!! 
We spent the day cleaning up at the house and when we where leaving the moon started to rise.  We went up to the deck off of our loft and enjoyed the show.  It was the perfect way to end the day.  The day started by Peter and myself installing a brake controller into my truck.  This controls the brakes for the travel trailer that Peter & Bettylou bought this winter.  They will use our truck to tow it.  Of course we get to us the trailer as well.  Oz & Raz can't wait. 
We then moved our gas fireplace to the house (with peter's help).  This goes in our bedroom.  Our electrician, HVAC contractor and framer wanted to see it as they could not believe how small of a foot print it has.  Anyway a lot has been done to the house.  The rough plumbing, HVAC and electric is complete as well as much more. 
The pictures will show it all.  Enjoy. 

2/4/10 - The timber frame deck 2/10/10 - The upstairs bathtub getting ready for some plumbing. 2/10/10 - Some of the plumbing is being run in the garage.  We will  then build a wall around it to cover it up.2/10/10 - Some of the plumbing is being run in the garage. 2/10/10 - The flange for the toilet.  Its so shiny and clean. How long  will that last?2/10/10 - The flange for the toilet.
2/10/10 - Lisa discussing the placement of the faucets for the tub with  the  plumber.  But why she asks?2/10/10 - Lisa discussing the placement of the faucets for the tub 2/10/10 - Our buddy Hank is in town.  All he wanted to do was move  stuff from one pile to another and play in the mud.2/10/10 - Our buddy Hank is in town. 2/10/10 - Gary Meyer our plumber.  working on the vent stack for our  washing machine and utility sink.2/10/10 - Gary Meyer our plumber. 2/11/10 - Waste line in the basement.
2/11/10 - Vent pipes. 2/11/10 - Drain pipe for our shower.  This is why the carpenters built  the floor in segments to accommodate the plumbing.2/11/10 - Drain pipe for our shower. 2/11/10 - Waste pipes and vent stack is in for the laundry room. 2/11/10 - Cutting the main drain pipe.  This goes out to the septic  system.2/11/10 - Cutting the main drain pipe.
2/11/10 - Gary is installing the water pipes.  He is using PVC instead  of copper.  It is a lot less expensive and is approved for both hot and  cold water.2/11/10 - Gary is installing the water pipes 2/11/10 - Waste pipes in the ceiling of the basement. 2/12/10 - This is the beginning of our 2/12/10 - This is the beginning of our "condo" style wall 2/12/10 - Our Jacuzzi tub is in place.
2/12/10 - The water pipes have been installed in our basement. 2/12/10 - A view from the south west side of our house 2/12/10 - Colin working on the "condo" wall. 2/14/10 - So on valentines day Lisa and I decided to install the shower  in  the 1st floor bathroom.  Here I am screwing in the cement boards to the  studs.2/14/10 - So on valentines day Lisa and I decided to install the showe
2/14/10 - Look at that hair. Don't I look like a real contractor. 2/14/10 - Lisa is applying silicone to the cement board.   What concentration.2/14/10 - Lisa is applying silicone to the cement board. 2/14/10 - This is what love is all about.  A passion for  perfection.2/14/10 - This is what love is all about. 2/14/10 - The base is in and one wall is up.  It looks like stone but  it is actually a panel shower.2/14/10 - The base is in and one wall is up.
2/14/10 - Here I am applying mastic to the wall. 2/14/10 - Action shot. 2/14/10 - Setting the panel into place. 2/14/10 - Looking good.
2/14/10 - Now the scary part.  We gotta cut some holes.2/14/10 - Now the scary part. We gotta cut some holes. 2/14/10 - Here we go. 2/14/10 - Now I am cutting a circle for the shower head with a jig saw. What concentration. 2/14/10 - The finished product.
2/14/10 - The back of the cement board. We put plastic their as a vapor barrier. 2/14/10 - Yes, I am happy. All the holes lined up. This is just a dry fitting. 2/14/10 - Lisa is sanding the back of the shower.  This helps the  board bond better with the mastic on the cement board.2/14/10 - Lisa is sanding the back of the shower. 2/14/10 - And its done for now.  We still have to finish the trim and  install the glass but this is all we need to do for the plumber for the  next  day.  Happy valentines day!!!2/14/10 - And its done for now.
2/15/10 - Gary the plumber making sure that the finish trim fits. <div>2/15/10 - Matt the other plumber is installing the rough plumbing  for the  tub.  The faucet and knobs will be on that wall in front the sprayer  will  be on the left corner.</div>2/15/10 - Matt the other plumber is installing the rough plumbing for the tub 2/15/10 - Ray and Colin working on the deck railing 2/17/10 - The deck has a roof.
2/17/10 - Ray and Luis cutting the lolly-column for the garage. 2/17/10 - A look at our covered deck. 2/17/10 - Ray hammering the lolly column into place. 2/17/10 - A little at the bottom.
2/17/10 - Luis is starting to side below the deck. 2/17/10 - CC & OC's new heated and insulated house.  Thanks Dad  & Iris.2/17/10 - CC & OC's new heated and insulated house 2/17/10 - The east view. <div>2/19/10 - The pocket door in the upstairs bath has been installed.   At  least the frame anyway.</div>2/19/10 - The pocket door in the upstairs bath has been installed
2/19/10 - The rough plumbing for the tub is in. 2/19/10 - Meet the HVAC contractors. 2/19/10 - Cutting some insulation that goes around the ducts. <div>2/19/10 - Lisa and Roger.  Roger is Oz and Raz best friend.  He  was down for a week vacation with us and he loved being at the site.</div>2/19/10 - Lisa and Roger. Roger is Oz and Raz best friend
<div>2/19/10 - A picture from the south west side.  Its really coming  along.  The roof of the deck has the trim installed and the siding as  well.</div>2/19/10 - A picture from the south west side. 2/19/10 - Cutting in a vent. I forget his name. <div>2/19/10 - Almost there.  He thought he could remove the drywall but  I  explained that would not work with a sip panel.</div>2/19/10 - Almost there. 2/19/10 - We have a hole.
2/19/10 - Ducts all lined up and ready to be installed. <div>2/19/10 - Al making more ducts.  All ducts are custom made on  site.</div>2/19/10 - Al making more ducts 2/19/10 - Al does 2 at a time. 2/19/10 - Finished product. Now all it needs is some insulation.
2/22/10 - Ducts are being installed in the basement 2/22/10 - Stair wall has been built. <div>2/22/10 - Heating duct for the master bedroom and bathroom has been   installed.</div>2/22/10 - Heating duct for the master bedroom <div>2/23/10 - The bays in the basement are filling up quick with duct  work.</div>2/23/10 - The bays in the basement are filling up quick with duct work.
2/23/10 - Installing more ducts in the basement. 2/23/10 - The duct and return for the master bedroom and bath. <div>2/26/10 - The electricians have been hard at work roughing in their   wires.  They all end up here at the breaker box.</div>2/26/10 - The electricians have been hard at work roughing in their wires. 2/26/10 - The master bedroom wall filled with wires. switches and lights.
<div>2/26/10 - The master shower recessed lighting.  Its gonna be funky  with lights on the walls.</div>2/26/10 - The master shower recessed lighting 2/26/10 - The bathroom wall with wires, plumbing and HVAC. 2/26/10 - Another shot. There a lot going on there. <div>2/28/10 - The full moon that I mentioned earlier.  Our 1st view  from  the deck off our loft.</div>Our 1st view from the deck off our loft.

Oh by the way we are not the only ones with a new home.  The 2 stray cats who have made South St. their new residence have got themselves a new home thanks to my dad & Iris.  It is heated, insulated and came with a heated water dish.  Its awesome and they really love it.

Well its getting late.  We hope you like the pictures.  Thanks again for your interest.
Lisa, Adam, Oz & Raz
 

Add comment


Security code
Refresh

Contact Us!

  1. Your Name(*)
    Please let us know your name.
  2. Your Email(*)
    Please let us know your email address.
  3. Subject(*)
    Please write a subject for your message.
  4. Message(*)
    Please let us know your message.
  5. Please type the 4 letters
    Please type the 4 letters
      RefreshInvalid Input
Brooks Post & Beam Inc.
208 Pettingill Hill Road, Lyndeborough, New Hampshire 03082
Tel (603) 654-3210
Copyright ©2008 Brooks Post & Beam Inc.- All Rights Reserved.
Home | Search MLS | Bookmark this page | Paul Freeman